Customization: | Available |
---|---|
After-sales Service: | 3 Years |
Warranty: | 3 Years |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ABOUT SOLID Tire:
As a professional manufacturer of solid tyre, protector and tyre patch, and can provide pneumatic rim type solid tyre, press-fit solid tyre, eco-friendly solid-core tyre, tractor, trailer solid tyre and a variety of nonstandard solid tyres compliant with TRA, ETRTO, JATMA standards by introducing the most advanced solid tyre design and production technology in the world. Our products are featured by extremely high wear resistance, very low rolling resistance, great lifespan, maintenance freedom and piercing resistance.
We always insist on the tenet of "Quality First, Customer Supreme, Quality Service, Contract Honored", and develop reciprocal cooperation with customers at home and abroad with high-quality product, good reputation and best service for common development and a brilliant future!
SIZE (inch) | Rim Size(inch) | Pattern | Outside Diameter | Section Width | Weight | FOB USD QINGDAO |
CBM |
±5mm | ±5mm | ±1.5%kg | |||||
3.50-5 | 3.0 | ZC-C302 | 287 | 88 | 5 | 13 | 0.007 |
3.20-8 | 3.0;3.75 | ZC-T201 | 318 | 94 | 6 | 13 | 0.01 |
4.00-8 | 3.0;3.75 | ZC-T201 ZC-A301 |
410 | 100 | 11 | 21 | 0.017 |
5.00-8 | 3.0;3.5 | ZC-A301 ZC-C302 |
455 | 117 | 15.5 | 31 | 0.024 |
15×4 1/2-8 | 3.0;3.33 | ZC-C302 ZC-S601 |
375 | 106 | 10 | 20 | 0.015 |
16×6-8 | 4.33 | ZC-C302 | 405 | 135 | 15 | 30 | 0.022 |
18×7-8 | 4.33 | ZC-C302 ZC-A301 |
442 456 |
125 167 |
18 24 |
36 48 |
0.025 0.035 |
180/70-8 | 4.33 | ZC-M901 | 450 | 140 | 21 | 42 | 0.03 |
6.00-9 | 4.0 | ZC-A301 ZC-B401 ZC-C302 |
518 | 126 | 26.5 | 53 | 0.034 |
7.00-9 | 5.0 | ZC-A301 | 550 | 145 | 34.5 | 69 | 0.044 |
21×8-9 | 6.0 | ZC-A301 ZC-C302 |
516 | 178 | 35 | 70 | 0.047 |
6.50-10 | 5.0 | ZC-A301 ZC-B401 ZC-C302 |
565 | 146 | 35 | 70 | 0.047 |
23×9-10 | 6.50 | ZC-A301 ZC-C302 |
565 | 185 | 44 | 88 | 0.06 |
200/50-10 | 6.50 | ZC-A301 ZC-C302 |
465 | 168 | 25 | 50 | 0.036 |
7.00-12 | 5.0 | ZC-A301 ZC-B401 ZC-C302 |
642 | 160 | 46.5 | 92 | 0.066 |
8.25-12 | 5.0 | ZC-A301 | 695 | 178 | 65 | 130 | 0.086 |
23×10-12 | 8.0 | ZC-C302 ZC-A301 |
580 570 |
222 208 |
52 46 |
105 92 |
0.075 |
27×10-12 | 8.0 | ZC-A301 ZC-C302 |
665 655 |
230 221 |
73 69.5 |
146 139 |
0.1 |
5.50-15 | 4.5 | ZC-A301 | 680 | 146 | 45 | 90 | 0.068 |
6.00-15 | 4.5 | ZC-A301 | 705 | 155 | 48 | 96 | 0.077 |
6.50-16 | 5.5 | ZC-A301 | 675 | 144 | 44 | 96 | 0.066 |
7.00-15 | 5.50;6.00 | ZC-A301 | 740 | 177 | 67.5 | 135 | 0.097 |
7.00-16 | 5.50;6.00 | ZC-A301 | 805 | 170 | 80.5 | 165 | 0.11 |
7.50-15 | 5.50,6.00 | ZC-A301 | 740 | 176 | 67.5 | 135 | 0.097 |
7.50-16 | 5.50;6.00 | ZC-A301 | 805 | 170 | 82 | 165 | 0.11 |
8.25-15 | 6.5 | ZC-A301 | 800 | 198 | 88 | 180 | 0.127 |
8.25-16 | 6.5 | ZC-A301 | 815 | 190 | 88 | 180 | 0.126 |
28×9-15(8.15-15) | 7.0 | ZC-A301 ZC-B401 ZC-C302 |
700 | 210 | 64 | 126 | 0.1 |
250-15 | 7.0 | ZC-A301 | 700 | 202 | 72 | 145 | 0.1 |
300-15 | 8.0 | ZC-A301 | 791 | 233 | 106 | 228 | 0.146 |
355/65-15 | 9.75 | ZC-A301 | 791 | 283 | 120 | 258 | 0.18 |
9.00-16 | 6.5 | ZC-E3 | 832 | 230 | 106.5 | 220 | 0.16 |
16/70-16 | 10.0 | ZC-SKS | 890 | 275 | 148.5 | 310 | 0.218 |
20.5/70-16 | 10.0 | ZC-SKS | 890 | 275 | 148.5 | 310 | 0.218 |
30X10-16 | 6.0 | ZC-SKS | 740 | 235 | 71 | 145 | 0.13 |
30X10-16 | 6.0 | Smooth | 780 | 233 | 90 | 182 | 0.15 |
33X12-20 | 8.0 | ZC-SKS | 830 | 280 | 96 | 193 | 0.2 |
33X12-20 | 8.0 | Smooth | 823 | 288 | 112 | 224 | 0.2 |
10-16.5 | 8.3(212) | ZC-SKS | 775 | 248 | 96 | 192 | 0.149 |
12-16.5 | 10.00(252) | ZC-SKS | 825 | 278 | 124.5 | 249 | 0.189 |
8.25-20 | 6.50,7.00 | ZC-A301 | 935 | 200 | 112 | 238 | 0.175 |
9.00-20 | 6.50,7.00 | ZC-A301 | 945 | 210 | 134 | 280 | 0.188 |
10.00-20 | 7.5,8.0 | ZC-A301 | 1040 | 253 | 189 | 390 | 0.274 |
11.00-20 | 7.5,8.0 | ZC-A301 | 1050 | 265 | 200 | 415 | 0.297 |
12.00-20 | 8.0,8.5 | ZC-A301 | 1105 | 260 | 237 | 490 | 0.212 |
12.00-20 | 8.0,8.5 | smooth | 1110 | 240 | 240 | 498 | 0.3 |
12.00-24 | 8.5 | ZC-A301 | 1140 | 300 | 246 | 510 | 0.4 |
14.00-24 | 10.0 | ZC-A301 | 1295 | 308 | 345 | 715 | 0.5 |
14.00-24 | 10.0 | ZC-C302 | 1300 | 340 | 395 | 820 | 0.6 |
14-17.5 | 8.0 | ZC-SKS | 1010 | 310 | 170 | 355 | 0.32 |
16/70-20 | 13.00.(324) | ZC-SKS | 1015 | 375 | 259 | 540 | 0.386 |
20.5/70-20 | 8.0 | ZC-SKS | 875 | 278 | 118 | 245 | 0.316 |
36*12.5-20 | 9.0 | ZC-E3/L3 | 895 | 291 | 140 | 290 | 0.24 |
41x14-20 | 11.5 | ZC-A301 | 1040 | 352 | 256 | 530 | 0.38 |
385/65-24 | 10.0 | ZC-SKS | 1040 | 338 | 194 | 402 | 0.36 |
445/65-24 | 10.0 | ZC-D501 | 1128 | 432 | 353 | 780 | 0.55 |
14.00-25 | 10.0 | ZC-C302 | 1300 | 340 | 395 | 820 | 0.6 |
16.00-25 | 11.25 | ZC-L5 | 1365 | 370 | 484 | 1080 | 0.7 |
17.5-25 | 14.0 | ZC-E3/L3 | 1350 | 415 | 533 | 1200 | 0.8 |
17.5-25 | 14.0 | ZC-L5 | 1365 | 370 | 500 | 1120 | 0.7 |
18.00-25 | 13.0 | ZC-L5 | 1580 | 420 | 765 | 1750 | 1.05 |
20.5-25 | 17.0 | ZC-L5 | 1400 | 470 | 648 | 1480 | 0.92 |
23.5-25 | 19.5 | ZC-E3/L3 | 1580 | 550 | 1050 | 2500 | 1.4 |
23.5-25 | 19.5 | ZC-L5 | 1580 | 502 | 960 | 2250 | 1.3 |
26.5-25 | 22.0 | ZC-L5 | 1680 | 620 | 1300 | 3250 | 1.75 |
29.5-25 | 26.5 | ZC-L5 | 1830 | 690 | 1840 | 4650 | 2.344 |
Construction and Structure of tires
When it comes to selecting the right truck and construction vehicle tire patterns based on road conditions and work environments, several factors should be considered. Here are some key considerations and corresponding tire patterns:
Highway/Tarmac Roads:Our company offers international logistics services that are cost-effective, efficient, and secure. Here is a brief overview of the services we provide for a high-quality one-stop international procurement experience, from factories to destination ports:
Q1. What is your terms of payment? A: T/T, L/C, PayPal, West Union. 30% T/T in advance, 70% balance against by copy of B/L
Q2. What is your terms of delivery? A: FOB, CIF, CFR
Q3. How about your delivery time? A: Usually, it will take 30 to 45 days after receive your deposit. In fact the delivery time according to your order quantity.
Q4. Can you produce according to the samples and confirm the quality? A: Yes, we will produce the same to the sample, our engineer and quality control team will manage the production and check each step one by one to make sure that the final products are qualified before shipment.
Q5. What is your accepted payment Currency? A: USD or RMB(Less).